At a rail summit held in London, attendees were advised that reinstating the line and building a station in Wisbech could cost £52.6m, including a £15.6m bridge over the A47, while the bill for an out of town station south of the A47 would be £31m. The original estimate for the project was £12m. However, the costs are still being finalised as Atkins completes the report.