Timelapse shows Cambridge North footbridge installation

Posted by

Timelapse footage has captured the installation of a footbridge that connects the ticket office with the platforms at the new Cambridge North railway station, due to open in May 2017 as part of Network Rail’s Railway Upgrade Plan.

The footbridge was installed in two sections and links all three platforms to the new ticket office, lift shafts and stairwells. Each section was built on site and lifted into position last weekend.

The station is due to open in May next year.

Leave a Reply

Your email address will not be published. Required fields are marked *